Solar Pile Drivers

admin 2018-08-09T22:22:52+00:00

Project Description

Solar Pile Drivers

Overview

Mazaka brand has been developing and supplying the industry with light construction machines in the industry from last 30 years. Mazaka pile drivers are unrivalled in their efficiency. The machines are specifically designed for driving steel solar piles, installing up to 450 piles per day.

The machine includes a 34.6 kilowatt water cooled Mitsubishi engine. These are much quieter and more suited for warmer climates than post drivers with air cooled engines. The fuel consumption is 2.5 litres/hour as compared with most of the other pile driver which consumes 4.5 – 5 litres/hour. As an OEM partner of Mitsubishi we get full support from Mitsubishi in terms of motor serivces.

Mazaka machines drives steel piles for solar plants/farms also guardrails. These pile drivers are built with quality components from reputable, globally recognised brands. Every component is individually selected and evaluated to ensure you are getting the very best, most efficient, reliable and productive options available. These machines can be customised to meet your pile driving requirements.

With Japanese power Mitsubishi and Turkish heavy machinery manufacturer, Mazaka, is becoming the world’s leader in pile driving machines. The company also specialises in unusual or specific problem by designing and manufacturing equipment to order. Mazaka is renowned for using the finest quality materials and adhering to the highest manufacturing standards, giving its machines an unrivalled reputation for reliability. Premium after-sales service and expert on-site training make Mazaka the go-to brand for civil engineering contractors the world over.

Features & Benefits

Special features which will benefit the owner of Mazaka pile drivers:

  • Custom built to suit the client’s requirements
  • Designed for easy transportation – Mazaka pile drivers can fold up to transport on a trailer behind a truck.
  • Compact – at 2 metres wide, these pile drivers can navigate narrow PV lines with ease.
  • Durable – Mazaka pile drivers will easily last 10–15 years, installing thousands of piles, year after year.
  • Powerful – Machine uses Powerful Mitsubishi Engine, hammer power is important in ensuring the pile is driven to the correct depth. Underpowered solar machines are the cause of many on-site issues.
  • Low running costs – you will get approximately 3 days’ work to fill the fuel tank, with occasional oil changes and replacement of post heads. Mitsubishi water cooled engine. These are bigger, powerful, much quieter and more suited for continous running than other post drivers with air cooled engines. Mitsubishi engines have lower servicing and low maintenance costs.
  • High functionality – Mazaka machines have the best functionality of all pile drivers on the market, with the largest selection of attachments – including DTH rock drill, auger and concrete core drill attachments. These machines can be fitted with customised hammers to suit the ground conditions and pile type.
  • Accurate – the masts on these machines have a hydraulic side shift; this is a necessity to correctly place piles in place. Note, other machines don’t normally offer this feature.

Specifications

Download Brochure

Videos

Contact Us Today!